An Integrated Vendor-Buyer Model with Exponentially Increasing Demand in Fuzzy Environment

Authors

  • U. Sarkar Department of Mathematics, MCKV Institute of Engineering, Liluah, Howrah, India.
  • A.K. Jalan Department of Mathematics, MCKV Institute of Engineering, Liluah, Howrah, India.
  • B.C. Giri Department of Mathematics, Jadavpur University, Kolkata, India.

Keywords:

Inventory, supply chain, vendor-buyer model, exponential demand, fuzzy

Abstract

In today’s marketing scenario, the coordination between vendor and buyer is getting great importance. A large numbers of supply chain models have been developed on exact parameter values. However, in reality, these parameter values may not be reliable due to vagueness. In this article, we develop an integrated vendor-buyer model with exponentially increasing demand at the buyer. Our purpose is to design a coordination mechanism between the vendor and the buyer with incomplete information about the cost parameters. We assume the set up cost, ordering cost, transportation cost, vendor’s and buyer’s holding costs in the fuzzy sense. We use centroid method for defuzzification of the fuzzy average total cost of the integrated system. The optimal results of the proposed fuzzy model are obtained and sensitivity of key model-parameters is examined through a numerical example.

References

Goyal, S.K. (1976). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15, 459-463.

Ben-Daya, M. & Hariga, M. (2004). Integrated single vendor single buyer model with stochastic demand and variable lead time. International Journal of Production Economics, 92, 75-80.

Li, J. and Liu, J. (2006). Supply chain coordination with quantity discount policy. International Journal of Production Economics, 101, 89-98.

Qin, Y., Tang, H. and Guo, C. (2007). Channel coordination and volume discounts with price sensitive demand. International Journal of Production Research, 105, 43-53.

Sajadieh, M.S., Akbari Jokar, M.R and Modarres, M. (2009). Developing a coordinated vendor-buyer model in two stage supply chains with stochastic lead time. Computers and Operations Research, 36, 2484-2489.

Yang, M.F. (2010). Supply chain integrated inventory model with present value and dependent crashing cost is polynomial. Mathematical and Computer Modelling, 51, 802-809.

Moharana, H.S., Murty, J.S., Senapati, S.K. and Khuntia, K. (2012). Coordination, collaboration and integration for supply chain management. International Journal of Interscience Management Review, 2(2), 2012.

Shah, N.H., Patel, D.G. and Shah, D.B. (2013). Optimal pricing, shipments and ordering policies for single-supplier single-buyer inventory system with price sensitive stock-dependent demand and order-linked trade credit. Global Journal of Researches in Engineering, 13(1), 2013.

Dey, O. and Giri, B.C. (2014). Optimal vendor investment for reducing defect rate in a vendor buyer integrated system with imperfect production process. International Journal of Production Economics, 155(1), 222–228.

Giri, B.C. and Bardhan, S. (2015). A vendor-buyer JELS model with stock-dependent demand and consigned inventory under buyer’s space constraint. Operational Research: An International Journal , 15, 79-93.

Zhang, Q., Luo, J. and Duan, Y. (2016). Buyer-vendor coordination for fixed lifetime product with quantity discount under finite production rate. International Journal of Systems Science, 47(4), 821–834.

Giri, B.C. and Sharma, S. (2017). Integrated model for an imperfect production-inventory system with a generalized shipment policy, errors in quality inspection and ordering cost reduction. International Journal of Systems Science: Operations and Logistics, 4(3), 260-274.

Li, J., Su, Q. and Ma, L. (2017). Production and transportation outsourcing decisions in the supply chain under single and multiple carbon policies. Journal of Cleaner Production, 141, 1109–1122.

Zadeh, L. (1965). Fuzzy sets. Information and Control, 8,338-353.

Yao, J.S. and Lee, H.M. (1996). Fuzzy inventory with backorder for fuzzy order quantity. Information Science, 93, 283-319.

Yao, J.S. and Chiang, J. (2003). Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and signed distance. European Journal of Operational Research, 148(2), 401-409.

Chiang, J., Yao, J.S. and Lee, H.M. (2005). Fuzzy inventory with backorder defuzzification by signed distance method. Journal of Information Science and engineering, 21,673-694.

Lin, Y.J. (2008). A periodic review inventory model involving fuzzy expected demand short and fuzzy backorder rate. Computers and Industrial Engineering, 54(3), 666-676.

Sadi-Nezhad, S., Nahavandi, S.M. and Nazeni, J. (2011). Periodic and continuous inventory models in the presence of fuzzy costs. International Journal of Industrial Engineering Computations, 2, 167-178.

Lee, H.M. and Lin, L. (2011). Applying signed distance method for fuzzy inventory without backorder. International Journal of Innovative Computing, Information and Control, 7(6), 3523-3531.

Sarkar, S. and Chakrabarti, T. (2012). An EPQ model with two-component demand under fuzzy environment and Weibull distribution deterioration with shortages. Hindawi Publishing Corporation, Mathematical Problems in Engineering, doi:10.1155/2012/264182.

Dey, O., Giri, B.C. and Chakraborty, D. (2016). A fuzzy random continuous review inventory model with a mixture of backorders and lost sales under imprecise chance constraint, International Journal of Operational Research, 26(1), 34-51.

Mahata, G., Goswami, A. and Gupta, D. (2005). A joint economic-lot-size model for purchaser and vendor in fuzzy sense. Computers and Mathematics with Applications, (10-12), 1767-1790.

Gunasekaran, N., Rathesh, S., Arunachalam, S. and Koh, S.C.L. (2006). Optimizing supply chain management using fuzzy approach. Journal of Manufacturing Technology Management, 17(6), 737-749.

Sucky, E. (2006). A bargaining model with asymmetric information for a single supplier-single buyer problem. European Journal of Operational Research, 171(2), 516-535.

Costantino, N., Dotoli, M., Falagario, M., Fanti, M.P. and Mangini, A.M. (2012). A model for supply management of agile manufacturing supply chains. International Journal of Production Economics, 135, 451-457.

Sinha, S. and Sarmah, S.P. (2008). An application of fuzzy set theory for supply chain coordination. International Journal of Management Science and Engineering Management, 3(1), 19-32.

Mahata, G. C. (2015). An integrated production-inventory model with backorder and lot for lot policy in fuzzy sense. International Journal of Mathematics in Operational Research, 7, 69–102.

Priyan, S. and Uthayakumar, R. (2016). Economic design of multi-echelon inventory system with variable lead time and service level constraint in a fuzzy cost environment. Fuzzy Information and Engineering, 8, 465–511.

Jauhari, W. A. and Saga, R. S. (2017). A stochastic periodic review inventory model for vendor–buyer system with setup cost reduction and service–level constraint. Production & Manufacturing Research, 5:1, 371-389.

Downloads

Published

27-11-2021

How to Cite

U. Sarkar, A.K. Jalan, & B.C. Giri. (2021). An Integrated Vendor-Buyer Model with Exponentially Increasing Demand in Fuzzy Environment. International Journal of Management Studies (IJMS), 5(3(5), 69–77. Retrieved from https://researchersworld.com/index.php/ijms/article/view/1926

Issue

Section

Articles